Project Progress

From Vision to Reality

1

Start Up Complete ✓

2

Planning In Progress

3

Fund Raising Upcoming

4

Construction Upcoming

5

Operations Upcoming

TCPAC Overview

Phase 1 — Start Up (Complete)

  • TCPAC presented conceptual drawings of the building along with a site plan indicating the proposed location of the center on the Chastain Campus to the IRSC Board of Trustees for acceptance.

Second Floor

- Balcony seating & second floor lobby
- Chorus & control rooms
- Flexible theater control / projection
- Founders / Donors Lounge
- Founder's Terrace lake overlook
- Outdoor terrace / lake overlook
- Building services & mechanical

$200K Phase 2 Cost Estimate

2026 Phase 2 Target

Phase 3: Upon acceptance by the IRSC Board of Trustees of the building plans, TCPAC & IRSC will cooperate in fund raising.

First Floor

- Main entrance, lobby & box office
- Main performance hall with side boxes
- Classrooms, practice rooms & music lab
- Major rehearsal rooms
- Acoustic chambers / exiting
- Flexible theater seating area
- Performer / back of house support
- Concessions, gift shop & restrooms

nm
Row topography Shape Decorative svg added to bottom
2nd1

Second Floor

- Balcony seating & second floor lobby
- Chorus & control rooms
- Flexible theater control / projection
- Founders / Donors Lounge
- Founder's Terrace lake overlook
- Outdoor terrace / lake overlook
- Building services & mechanical

Third Floor / Roof

- Function space & exterior deck
- Concessions & restrooms
- Clerestory daylight into major rehearsal rooms
- Roof line & mechanical room

Roof Plan Visual

Help Us Make History

Together, we can make history and create something truly special that will stand for generations. Your support will lay the foundation for a cultural renaissance in our community, setting the stage for countless lives to be enriched and empowered by the arts.