From Vision to Reality
Start Up Complete ✓
Planning In Progress
Fund Raising Upcoming
Construction Upcoming
Operations Upcoming
Phase 1 — Start Up (Complete)
- TCPAC presented conceptual drawings of the building along with a site plan indicating the proposed location of the center on the Chastain Campus to the IRSC Board of Trustees for acceptance.
Second Floor
- Balcony seating & second floor lobby
- Chorus & control rooms
- Flexible theater control / projection
- Founders / Donors Lounge
- Founder's Terrace lake overlook
- Outdoor terrace / lake overlook
- Building services & mechanical
$200K Phase 2 Cost Estimate
2026 Phase 2 Target
Phase 3: Upon acceptance by the IRSC Board of Trustees of the building plans, TCPAC & IRSC will cooperate in fund raising.
First Floor
- Main entrance, lobby & box office
- Main performance hall with side boxes
- Classrooms, practice rooms & music lab
- Major rehearsal rooms
- Acoustic chambers / exiting
- Flexible theater seating area
- Performer / back of house support
- Concessions, gift shop & restrooms
Second Floor
- Balcony seating & second floor lobby
- Chorus & control rooms
- Flexible theater control / projection
- Founders / Donors Lounge
- Founder's Terrace lake overlook
- Outdoor terrace / lake overlook
- Building services & mechanical
Third Floor / Roof
- Function space & exterior deck
- Concessions & restrooms
- Clerestory daylight into major rehearsal rooms
- Roof line & mechanical room
Help Us Make History
Together, we can make history and create something truly special that will stand for generations. Your support will lay the foundation for a cultural renaissance in our community, setting the stage for countless lives to be enriched and empowered by the arts.